The track layout of the starter kit is being expanded with a staging yard. Additional turnouts, beacons, and signals are being installed. The necessary modules (CTC-Turnout-Module) must be integrated. The track plan is divided into blocks for the upcoming train operations.
The expansions result in the following track plan:
Further description to follow shortly.